Role Definition
Offshore Installation Naval Analysis Architect – with Offshore Transportation and Installation Experience
The resource shall be able to perform naval analysis for installation operation not limited to: Mooring analysis; engineered lifting / upending analysis; transportation analysis; floatover analysis; Hydrodynamic database calculation.
Minimum of 5 years in Installation analysis for offshore sector
Master’s degree in Naval Architecture
Mandatory software: Moses, Gmoor, Orcaflex, Mathcad
Nice to Have: Phyton