Role Definition
Provisional Schedule
EPCI contact for OSS and HVDC converter station have been signed off on May 02nd 2024 between RTE and the consortium.
A high-level project program for the CM1-CM2 EXC/ISL is presented below
-
Design phase CM1/CM2 EXC and ISL: 02/05/2024 – 31/12/2025
-
Fabrication CM1 EXC (Offshore section): 01/11/2024 – 31/01/2028
-
Fabrication CM2 EXC (Offshore section): 01/11/2025 – 30/05/2030
SCOPE OF WORK
1/ Technical support to Employer for Welding engineering topics
This includes,
Review and comments of EPCI Contractors proposed procedures likely:
-
Welding book (including WPQR booklet & WPS)
-
Weld map
-
Welding production testing plans
-
Welding consumable procedure
(This shall include necessary knowledge on welding, as well as materials aspects).
This review applies to EPCI Contractors procedures included their subcontractors as per MDR document
3 main scope identified to be quoted as lump sum
-
Topside scope – indicative period oct 2025 for submitted first IFR (issue for review procedures)
-
Cofferdam scope– indicative period sept 2025 (issue for review procedures)
-
Jacket scope – indicative period oct 2025 (issue for review procedures)
-
Pile scope – indicative period july 2025 (issue for review procedures)
2/ Technical support in reviewing Non-Conformity Reports, Deviation requests, Technical queries during EPCI project.
3/ Site activities (optional scope)
-
Participation to technical inspection on site /yard depending on criticality / contractor appraisal
-
WPT tests witnessing on site
Main referenced applicable codes/standards
-
DNV-ST-0145 Offshore substations (governing standards)
-
DNV-OS-C401 Fabrication and testing of offshore structures